CLARA Costa Rica
Sign in Sign in

The Clara Standard

Twelve things every development we list should have.

Clean, registered title: Title and permitsOutside the maritime zone: Title and permitsEnvironmental approval: Title and permitsA written water letter for every lot: WaterA record of supply: WaterFiber internet at the gate: Internet and powerPower to every lot: Internet and powerPaved road to the gate: Access and healthcareEmergency care within 30 minutes: Access and healthcareLiberia airport within 90 minutes: Access and healthcareDeposits held in escrow: Money and paperworkA published owners' budget: Money and paperwork
  1. Clean, registered titleTitle and permits

    Every lot has its own registered title in the Registro Nacional, with no liens or annotations.

    Why it matters. A clean registry record is the main protection against title problems.

    How we check. We pull each lot's registry record and survey plan.

  2. Outside the maritime zoneTitle and permits

    No lot sits in the 200 m maritime zone, or any concession is disclosed in writing.

    Why it matters. Concession land is leased, not owned, and has limits for foreigners.

    How we check. We compare each survey plan with the high-tide line.

  3. Environmental approvalTitle and permits

    SETENA environmental approval on file for the development.

    Why it matters. Building permits depend on it.

    How we check. We record the SETENA file number and date.

  4. A written water letter for every lotWater

    A water-availability letter from the ASADA or AyA, or a well concession, covering every lot for sale.

    Why it matters. The municipality won't issue a building permit without proof of water.

    How we check. We read the letter: who issued it, the date, and how many lots it covers.

  5. A record of supplyWater

    Written records of any water cuts in the last 24 months, and on-site storage.

    Why it matters. Aquifers around Tamarindo and Flamingo are limited (MINAE, 2023).

    How we check. Owners' association records and supplier notices.

  6. Fiber internet at the gateInternet and power

    Fiber available at the gate, with at least 100 Mbps measured in the evening.

    Why it matters. Most buyers work, call family or stream from home.

    How we check. Three speed tests at 10:00 and 20:00; we publish the median.

  7. Power to every lotInternet and power

    Grid power available at every lot line.

    Why it matters. Bringing power to a lot later is slow and expensive.

    How we check. Developer plans and the power company's connection records.

  8. Paved road to the gateAccess and healthcare

    A paved public road all the way to the entrance.

    Why it matters. Dirt roads wash out in the rainy season.

    How we check. We drive it and photograph it.

  9. Emergency care within 30 minutesAccess and healthcare

    A 24-hour emergency room within a 30-minute drive.

    Why it matters. It matters most to buyers who plan to live here.

    How we check. Confirmed by phone; drive time on Google Maps.

  10. Liberia airport within 90 minutesAccess and healthcare

    Liberia airport (LIR) within a 90-minute drive.

    Why it matters. Most owners fly in and out several times a year.

    How we check. Google Maps, Tuesday at 10:00, from the gate.

  11. Deposits held in escrowMoney and paperwork

    Reservation deposits go to an escrow company under a written agreement, not straight to the developer.

    Why it matters. Costa Rica has no escrow law, so the agreement is your protection.

    How we check. We read the escrow agreement.

  12. A published owners' budgetMoney and paperwork

    The owners' association (HOA) budget and fee are written down and shared before you reserve.

    Why it matters. Unpaid fees become a lien on the lot (Law 7933).

    How we check. We read the current budget.

Compare the developments

Open the compare tool

Our reading of the developer's documents, dated November 23, 2026. Points marked Not sure yet are still being checked.

SenderosTamarindo
Clean, registered title: Has itOutside the maritime zone: Has itEnvironmental approval: Has itA written water letter for every lot: Has itA record of supply: Not sure yetFiber internet at the gate: Has itPower to every lot: Has itPaved road to the gate: Has itEmergency care within 30 minutes: Has itLiberia airport within 90 minutes: Has itDeposits held in escrow: Not sure yetA published owners' budget: Has it
See all 12 checks
  • Clean, registered titleHas it
  • Outside the maritime zoneHas it
  • Environmental approval (SETENA)Has it
  • Water letter for every lotHas it
  • Record of water supplyNot sure yet
  • Fiber internet at the gateHas it
  • Power to every lotHas it
  • Paved road to the gateHas it
  • 24-hour ER within 30 minHas it
  • Liberia airport within 90 minHas it
  • Deposits held in escrowNot sure yet
  • Published owners' budgetHas it
Mar VistaPlaya Flamingo
Clean, registered title: Has itOutside the maritime zone: Has itEnvironmental approval: Has itA written water letter for every lot: Under legal reviewA record of supply: Under legal reviewFiber internet at the gate: Has itPower to every lot: Has itPaved road to the gate: Has itEmergency care within 30 minutes: Has itLiberia airport within 90 minutes: Has itDeposits held in escrow: Not sure yetA published owners' budget: Not sure yet
See all 12 checks
  • Clean, registered titleHas it
  • Outside the maritime zoneHas it
  • Environmental approval (SETENA)Has it
  • Water letter for every lotUnder legal review
  • Record of water supplyUnder legal review
  • Fiber internet at the gateHas it
  • Power to every lotHas it
  • Paved road to the gateHas it
  • 24-hour ER within 30 minHas it
  • Liberia airport within 90 minHas it
  • Deposits held in escrowNot sure yet
  • Published owners' budgetNot sure yet
Cala PlumeriaPlaya Flamingo
Clean, registered title: Has itOutside the maritime zone: Doesn'tEnvironmental approval: Has itA written water letter for every lot: Not sure yetA record of supply: Not sure yetFiber internet at the gate: Not sure yetPower to every lot: Not sure yetPaved road to the gate: Not sure yetEmergency care within 30 minutes: Has itLiberia airport within 90 minutes: Has itDeposits held in escrow: Not sure yetA published owners' budget: Not sure yet
See all 12 checks
  • Clean, registered titleHas it
  • Outside the maritime zoneDoesn't
  • Environmental approval (SETENA)Has it
  • Water letter for every lotNot sure yet
  • Record of water supplyNot sure yet
  • Fiber internet at the gateNot sure yet
  • Power to every lotNot sure yet
  • Paved road to the gateNot sure yet
  • 24-hour ER within 30 minHas it
  • Liberia airport within 90 minHas it
  • Deposits held in escrowNot sure yet
  • Published owners' budgetNot sure yet
CantomarPlaya Flamingo
Clean, registered title: Has itOutside the maritime zone: Not sure yetEnvironmental approval: Has itA written water letter for every lot: Not sure yetA record of supply: Not sure yetFiber internet at the gate: Has itPower to every lot: Has itPaved road to the gate: Has itEmergency care within 30 minutes: Has itLiberia airport within 90 minutes: Has itDeposits held in escrow: Not sure yetA published owners' budget: Not sure yet
See all 12 checks
  • Clean, registered titleHas it
  • Outside the maritime zoneNot sure yet
  • Environmental approval (SETENA)Has it
  • Water letter for every lotNot sure yet
  • Record of water supplyNot sure yet
  • Fiber internet at the gateHas it
  • Power to every lotHas it
  • Paved road to the gateHas it
  • 24-hour ER within 30 minHas it
  • Liberia airport within 90 minHas it
  • Deposits held in escrowNot sure yet
  • Published owners' budgetNot sure yet
HalaconPlaya Flamingo
Clean, registered title: Not sure yetOutside the maritime zone: Not sure yetEnvironmental approval: Not sure yetA written water letter for every lot: Not sure yetA record of supply: Not sure yetFiber internet at the gate: Not sure yetPower to every lot: Not sure yetPaved road to the gate: Not sure yetEmergency care within 30 minutes: Has itLiberia airport within 90 minutes: Has itDeposits held in escrow: Not sure yetA published owners' budget: Not sure yet
See all 12 checks
  • Clean, registered titleNot sure yet
  • Outside the maritime zoneNot sure yet
  • Environmental approval (SETENA)Not sure yet
  • Water letter for every lotNot sure yet
  • Record of water supplyNot sure yet
  • Fiber internet at the gateNot sure yet
  • Power to every lotNot sure yet
  • Paved road to the gateNot sure yet
  • 24-hour ER within 30 minHas it
  • Liberia airport within 90 minHas it
  • Deposits held in escrowNot sure yet
  • Published owners' budgetNot sure yet
The RidgePlaya Flamingo
Clean, registered title: Has itOutside the maritime zone: Has itEnvironmental approval: Has itA written water letter for every lot: Under legal reviewA record of supply: Under legal reviewFiber internet at the gate: Has itPower to every lot: Has itPaved road to the gate: Has itEmergency care within 30 minutes: Has itLiberia airport within 90 minutes: Has itDeposits held in escrow: Not sure yetA published owners' budget: Not sure yet
See all 12 checks
  • Clean, registered titleHas it
  • Outside the maritime zoneHas it
  • Environmental approval (SETENA)Has it
  • Water letter for every lotUnder legal review
  • Record of water supplyUnder legal review
  • Fiber internet at the gateHas it
  • Power to every lotHas it
  • Paved road to the gateHas it
  • 24-hour ER within 30 minHas it
  • Liberia airport within 90 minHas it
  • Deposits held in escrowNot sure yet
  • Published owners' budgetNot sure yet
FaroPlaya Penca
Clean, registered title: Not sure yetOutside the maritime zone: Not sure yetEnvironmental approval: Not sure yetA written water letter for every lot: Not sure yetA record of supply: Not sure yetFiber internet at the gate: Not sure yetPower to every lot: Not sure yetPaved road to the gate: Not sure yetEmergency care within 30 minutes: Not sure yetLiberia airport within 90 minutes: Not sure yetDeposits held in escrow: Not sure yetA published owners' budget: Not sure yet
See all 12 checks
  • Clean, registered titleNot sure yet
  • Outside the maritime zoneNot sure yet
  • Environmental approval (SETENA)Not sure yet
  • Water letter for every lotNot sure yet
  • Record of water supplyNot sure yet
  • Fiber internet at the gateNot sure yet
  • Power to every lotNot sure yet
  • Paved road to the gateNot sure yet
  • 24-hour ER within 30 minNot sure yet
  • Liberia airport within 90 minNot sure yet
  • Deposits held in escrowNot sure yet
  • Published owners' budgetNot sure yet
The full table
The full table
RequirementSenderosMar VistaCala PlumeriaCantomarHalaconThe RidgeFaro
Clean, registered titleHas itHas itHas itHas itNot sure yetHas itNot sure yet
Outside the maritime zoneHas itHas itDoesn'tNot sure yetNot sure yetHas itNot sure yet
Environmental approvalHas itHas itHas itHas itNot sure yetHas itNot sure yet
A written water letter for every lotHas itUnder legal reviewNot sure yetNot sure yetNot sure yetUnder legal reviewNot sure yet
A record of supplyNot sure yetUnder legal reviewNot sure yetNot sure yetNot sure yetUnder legal reviewNot sure yet
Fiber internet at the gateHas itHas itNot sure yetHas itNot sure yetHas itNot sure yet
Power to every lotHas itHas itNot sure yetHas itNot sure yetHas itNot sure yet
Paved road to the gateHas itHas itNot sure yetHas itNot sure yetHas itNot sure yet
Emergency care within 30 minutesHas itHas itHas itHas itHas itHas itNot sure yet
Liberia airport within 90 minutesHas itHas itHas itHas itHas itHas itNot sure yet
Deposits held in escrowNot sure yetNot sure yetNot sure yetNot sure yetNot sure yetNot sure yetNot sure yet
A published owners' budgetHas itNot sure yetNot sure yetNot sure yetNot sure yetNot sure yetNot sure yet
  • Has it
  • Under legal review
  • Not sure yet
  • Doesn't