Part 3: CFIA plans
Updated · 1 min read
Not yet reviewed by an architect. General information, not legal or tax advice.
In short
Your plans are prepared by a professional registered with CFIA (Colegio Federado de Ingenieros y de Arquitectos, the engineers' and architects' college) and filed through its digital system. That approval step (APC (Administrador de Proyectos de Construcción, the CFIA's online permit system)) can take about 24 hours (Howler, undated).
- Ask for the CFIA registration number of the architect and the engineer, and check it.
- Ask what the plans include: structure, electrical, plumbing, septic or treatment.
- Ask who supervises construction against the plans, and how often.
Work out the numbers: build cost calculator
Sources
- Howler, "Three stages to building in Costa Rica". Published undated. Checked November 13, 2026.
What changed
- November 13, 2026First published.
Tools for this guide
Stage 5: Build
Pick your team, get the permits and build, often from abroad.
Every guide in this stageTalk it through
Questions about your situation? A virtual tour with an advisor, no obligation.
Book a virtual tour