Building a home in Guanacaste from abroad, in eight parts
Updated · 1 min read
Not yet reviewed by an architect or a Costa Rican attorney. General information, not legal or tax advice.
In short
From design to moving in usually takes 12 to 18 months (TiConstru, undated; Coldwell Banker Costa Rica, 2026). The order matters more than the speed: team first, then water, plans, the environmental step and the permit, then building against milestones you can check from home.
- 1Team first: attorney, architect, builderWho to hire, in what order, before you draw anything.
- 2The water letterNo proof of water, no building permit.
- 3CFIA (Colegio Federado de Ingenieros y de Arquitectos, the engineers' and architects' college) plansPlans by a registered professional, approved through CFIA.
- 4SETENA (Secretaría Técnica Nacional Ambiental, the national environmental agency), the environmental stepEnvironmental viability before permits.
- 5The municipal permitThe fee, and how long it takes.
- 6Milestone paymentsPay for work done, checked, not for time passed.
- 7Overseeing it from homeReports, visits and your own inspector.
- 8HandoverWhat to check, and what to get in writing, before the last payment.
Before you start: how to hire an architect and a builder · questions to ask a builder · build cost calculator
Sources
- TiConstru, "Building in Costa Rica for foreigners". Published undated. Checked November 13, 2026.
- Coldwell Banker Costa Rica, "Build your Costa Rica home in 2026". Published 2026. Checked November 13, 2026.
What changed
- November 13, 2026First published.
Tools for this guide
Stage 5: Build
Pick your team, get the permits and build, often from abroad.
Every guide in this stageTalk it through
Questions about your situation? A virtual tour with an advisor, no obligation.
Book a virtual tour