Part 8: Handover

Updated · 1 min read

Not yet reviewed by an architect or a Costa Rican attorney. General information, not legal or tax advice.

In short

Hold back the last payment until the house is checked, the snag list is fixed, and you have the papers in hand.

Get in writing before the last payment

  • A walk-through with your inspector, and a written snag list with dates to fix each item.
  • The warranty: what it covers and for how long.
  • As-built plans, and manuals for equipment such as pumps, solar and air conditioning.
  • Proof that the INS workers' insurance and the builder's suppliers are paid.
  • The occupancy steps the municipality requires. Ask your architect what the municipality requires.

Work out the numbers: build cost calculator

That's the whole series

You've read all 8 parts of Building from abroad.

Back to Part 1

Estimate your build costBook a virtual tour

What changed

  • November 13, 2026First published.

Email me when these rules change

Checklist

Questions to ask a builder: the questions to ask, on one printable page.

Get the checklist
Stage 5: Build

Pick your team, get the permits and build, often from abroad.

Every guide in this stage
Talk it through

Questions about your situation? A virtual tour with an advisor, no obligation.

Book a virtual tour