Part 8: Handover
Updated · 1 min read
Not yet reviewed by an architect or a Costa Rican attorney. General information, not legal or tax advice.
In short
Hold back the last payment until the house is checked, the snag list is fixed, and you have the papers in hand.
Get in writing before the last payment
- A walk-through with your inspector, and a written snag list with dates to fix each item.
- The warranty: what it covers and for how long.
- As-built plans, and manuals for equipment such as pumps, solar and air conditioning.
- Proof that the INS workers' insurance and the builder's suppliers are paid.
- The occupancy steps the municipality requires. Ask your architect what the municipality requires.
Work out the numbers: build cost calculator
That's the whole series
You've read all 8 parts of Building from abroad.
What changed
- November 13, 2026First published.
Tools for this guide
Stage 5: Build
Pick your team, get the permits and build, often from abroad.
Every guide in this stageTalk it through
Questions about your situation? A virtual tour with an advisor, no obligation.
Book a virtual tour